Energy management calibration Prerequisites

Energy Management (EM) calibration is performed to calibrate the setting (gain and offset) of AD converters in several channels (that is, battery voltage, BSI, battery current) to get an accurate AD conversion result.

Hardware setup:

• An external power supply is needed.

• Supply 12V DC from an external power supply to CU-4 to power up the phone.

• The phone must be connected to a CU-4 control unit with a product-specific flash adapter.

Was this article helpful?

0 0
DIY Battery Repair

DIY Battery Repair

You can now recondition your old batteries at home and bring them back to 100 percent of their working condition. This guide will enable you to revive All NiCd batteries regardless of brand and battery volt. It will give you the required information on how to re-energize and revive your NiCd batteries through the RVD process, charging method and charging guidelines.

Get My Free Ebook


Post a comment